Belle Vale eco homes

  • Client: Liverpool Mutual Homes
  • Location: Naylorsfield Drive, Liverpool
  • Requirements: Off-site construction
  • Solution: P-Clad

Belle Vale is a £3.5m development of 33 eco homes that used modern methods of construction to build these modular houses off-site in a factory, where our P-Clad system was also installed.

Constructed for Liverpool Mutual Homes, the buildings were delivered to site in modular sections (ground, first floors and roofs) and were transported on the back of lorries and then craned into position.

The development has a contemporary mixed finish. We supplied circa 1600m² of our P-Clad system along with our Britannia Range Autumn Leaves brick, which was finished with a Smooth Red plinth detail. The ground floor was brick slip with a brick slip panel detail to the first floor and the client chose our Standard Grey Europoint pointing mortar.

Our cladding was installed off-site in a factory environment, which allows for greater quality control on a project of this scale and can also assist with the speed of project delivery.

Eurobrick Belle Vale project brickwork close up