Doubletree Hotel Exterior

DoubleTree by Hilton

  • Client: DoubleTree by Hilton
  • Location: Granta Place, Cambridge
  • Contractor: RG Carter Building Limited
  • Requirements: Lightweight brick finish
  • Solution: X-Clad

This DoubleTree by Hilton in Cambridge needed a lightweight brick finish to create an upwards extension to their hotel. Our X-Clad system was the perfect fit.

The project involved development of a 3-storey extension over the ground floor of the existing hotel and was constructed with a steel frame, with the weight of the structure supported on steel piers. We supplied circa 530 m2 of our lightweight 17mm X-Clad system, which was fixed to Admaster composite panels.

The exterior was completed with part brick slip cladding and part zinc metal rainscreen cladding. We supplied specially cut Con Mosso brick slips, corners and face and bed pieces. This brick was chosen as it was a close match to the existing hotel. Our approved installer ML Brickwork (Southern) carried out the installation.

Doubletree exterior close up
DoubleTree exterior brick slip cladding
DoubleTree exterior view