
Roman Way
- Client: Status Group Limited
- Location: Islington, London
- Requirements: An A1 brick finish rainscreen for new-build mixed-use development
- Solution: A-Clad


This is a new-build, four-storey mixed-use development on Roman Way in Islington, North London, combining commercial space at ground-floor level with eight new apartments.
The development includes one ground-floor apartment to the rear, with another seven one- and two-bedroom apartments, including a penthouse, arranged across the upper floors. A combination of traditional construction and rainscreen cladding was used. The traditional construction was used predominantly at ground-floor level, with framing and Eurobrick’s A-Clad system specified for the upper floors.
Eurobrick supplied approximately 400m² of A-Clad to contractor Status Group, with installation carried out by their sub-contractors. The brick slips for the project were sourced separately by the client.

A-Clad is Eurobrick’s Class A1 non-combustible brick slip rainscreen system. Developed for use on buildings of any height, the system combines a lightweight construction with the appearance of traditional brickwork and is suitable for new-build and refurbishment projects.
At Roman Way, A-Clad provided an A1 rated brick rainscreen finish for the upper storeys of the building, complementing the style of the traditional construction below. Its lightweight format makes it particularly well suited to projects where a traditional brick finish is required without the weight and structural requirements associated with full brickwork. A-Clad has been fully tested for reaction to fire and achieves an A1 classification to BS EN 13501-1:2018. The system has also undergone extensive mechanical testing, providing specifiers and contractors with a robust brick slip solution for rainscreen applications.
The completed Roman Way development demonstrates how A-Clad can be incorporated alongside traditional construction methods to deliver a consistent brick aesthetic.
For more information about A-Clad, or our other brick slip systems, please contact our technical team or visit the A-Clad page.



